Strutted frame

Completed in 2003

The bridge is formed by an unsymmetrical strutted frame. The deck is assembled from two plate girders and a concrete deck slab. Since the footing of the inclined strut is connected with the end diaphragm by a concrete strut, the structure forms a self-anchored system that stresses the footings by vertical reactions only.

Structure length

67.4 m

Location

Motorway D1, section 0133 Vyskov - Morice, Czech Republic

Span length

41.3 + 16.7 m

Structure type

Motorway overpass.

Width of the superstructure

9.60 m

Scope of work

Design for construction permission, detailed design.

MAP

GPS: 49.3147369N, 17.1567693E
zobrazit na mapy.cz