Completed in 2003
The bridge is formed by an unsymmetrical strutted frame. The deck is assembled from two plate girders and a concrete deck slab. Since the footing of the inclined strut is connected with the end diaphragm by a concrete strut, the structure forms a self-anchored system that stresses the footings by vertical reactions only.
Structure length
67.4 mLocation
Motorway D1, section 0133 Vyskov - Morice, Czech RepublicSpan length
41.3 + 16.7 mStructure type
Motorway overpass.Width of the superstructure
9.60 mScope of work
Design for construction permission, detailed design.
Completed in 2003
The bridge is formed by an unsymmetrical strutted frame. The deck is assembled from two plate girders and a concrete deck slab. Since the footing of the inclined strut is connected with the end diaphragm by a concrete strut, the structure forms a self-anchored system that stresses the footings by vertical reactions only.
Structure length
67.4 mLocation
Motorway D1, section 0133 Vyskov - Morice, Czech RepublicSpan length
41.3 + 16.7 mStructure type
Motorway overpass.Width of the superstructure
9.60 mScope of work
Design for construction permission, detailed design.