Under construction
The D3 motorway section between Žilina (Brodno) and Kysucké Nové Mesto crosses the Kysuca River twice at a very sharp angle. These crossings required bridge structures with a total length of 2.374 km. SHP is involved in the design of four bridges, totaling 1.792 km in length. The first and fourth bridges are constructed using the balanced cantilever method, with span lengths ranging from 38 to 95 m, while the second and third bridges are viaducts with a typical span of 58 m, built using a movable scaffolding system. Given the skewed river crossing, the balanced cantilever bridges are supported by circular columns topped with column heads, which in turn support a narrow box girder stiffened by transverse cantilevers.
Structure length
1.792 kmLocation
Motorway D3, Kysucké Nové Mesto.Span length
38,0 – 95.0 mStructure type
Box girder constructed using the balanced cantilever method and built on a movable scaffolding system.Width of the superstructure
2 x 13.95 mScope of work
Alternative proposal, Construction documentation.