Removal of the Old Bridge across the Danube River

Completed in 2014

Two parallel seven span bridges formed by simple spans of lengths from 32 to 92 m were temporarily connected above supports and subsequently were gradually dismantled. Dismantling was carried out gradually span-by-span; during disassembly, the dismantled span was supported by vessels.

Structure length

-

Location

Bratislava, Slovakia

Span length

-

Structure type

Steel railway bridge.

Width of the superstructure

-

Scope of work

Design of the disassembly of the steel structure, static analysis.

MAP

GPS: 48.1381380N, 17.1172131E
zobrazit na mapy.cz