Lunda Footbridge
Lunda Footbridge
Completed in 2019
The stress ribbon deck of one span is suspended on two suspension cables. The deck of a streamline cross section is assembled from precast segments of a variable width and a depth of only 0.34 m.
Structure length
181 mLocation
Umeå, SwedenSpan length
25 + 187 + 25 mStructure type
Stress ribbon suspended on the cable.Width of the superstructure
6.30 - 8.21 mScope of work
Alternative design, detailed design.
MAP
GPS:
63.8263678N, 20.2203629E
zobrazit na mapy.cz