Lunda Footbridge

Completed in 2019

The stress ribbon deck of one span is suspended on two suspension cables. The deck of a streamline cross section is assembled from precast segments of a variable width and a depth of only 0.34 m.

Structure length

179 m

Location

Umeå, Sweden

Span length

32.8 + 179 + 32.8 m

Structure type

Stress ribbon suspended on the cable.

Width of the superstructure

6.30 – 8.21 m

Scope of work

Alternative design, detailed design.

MAP

GPS: 63.8263678N, 20.2203629E
zobrazit na mapy.cz