Lunda Footbridge
 Lunda Footbridge
 Completed in 2019
The stress ribbon deck of one span is suspended on two suspension cables. The deck of a streamline cross section is assembled from precast segments of a variable width and a depth of only 0.34 m.
Structure length
179 mLocation
Umeå, SwedenSpan length
32.8 + 179 + 32.8 mStructure type
Stress ribbon suspended on the cable.Width of the superstructure
6.30 – 8.21 mScope of work
Alternative design, detailed design.
MAP
GPS: 
  63.8263678N, 20.2203629E
 
      zobrazit na mapy.cz
    