Fort Edmonton Footbridge across the Saskatchewan River

Completed in 2010

The stress ribbon deck of three spans is suspended on two suspension cables. The stress ribbon is assembled from precast segments of a depth of only 0.40 m.

Design: CH2M Hill, Edmonton, Alberta

Structure length

246 m

Location

Edmonton, Alberta, Canada

Span length

54 + 138 + 54 m

Structure type

Stress ribbon suspended on the cable.

Width of the superstructure

6.35 m

Scope of work

Jiri Strasky: Specialty consultant, checking of the design.

MAP

GPS: 53.4953215N, 113.5902939W
zobrazit na mapy.cz

AWARDS

2010 Awards of Excellence in Concrete, American Concrete Institute, Alberta Chapter.