D3 Motorway Viaducts in the Kaplice-Nazidla section

Under construction

Two similar viaducts, 612 m and 857 m long, are being built on the D3 motorway in the Kaplice‑Nažidla section. Both viaducts consist of two parallel bridges with spans from 30 to 50 m. The superstructure of each bridge consists of two continuous steel plate girders and a composite concrete slab. The piers, up to 30.9 m high, consist of slender reinforced concrete columns with pier caps. The steel beams are assembled behind the abutments and then incrementally launched into the designed position.

Structure length

612 m and 857 m

Location

D3 motorway in the Kaplice‑Nažidla section.

Span length

30.00 – 50.00 m

Structure type

Continuous steel‑concrete composite structure.

Width of the superstructure

2 x 14.75 m

Scope of work

Detailed design.

MAP

GPS: 48.7161606N, 14.4642445E