D1 Motorway Bridge near a village of Brnenske Ivanovice
D1 Motorway Bridge near a village of Brnenske Ivanovice
Completed in 2002
The bridge, which crosses a local creek, a rural road and a bio‑corridor is situated in the area with a very poor geotechnical condition and in the place where the motorway’s fill has a depth of 14 m. Therefore, the bridge is formed by a statically determined structure assembled of simple precast beams and a composite slab, and the fill is from polystyrene. Due to the heavy load the girders and slab are from a high‑strength concrete.
Structure length
36.5 mLocation
Motorway D1 near a village of Brnenske IvanoviceSpan length
34.8 mStructure type
Composite precast structure.Width of the superstructure
47.5 mScope of work
Design for construction permission, Tender design, Detailed design.