Crown Princess Mary’s Bridge
Crown Princess Mary’s Bridge
Completed in 2019
The bridge of total 17 spans is assembled of precast, match cast segments of one cell box girder that have been erected by a launching girder in symmetrical cantilevers starting at piers.
SHP was part of RBAI JV (together with Rizzani de Eccher, Italy, Besix, Belgium and Acciona Infraestructuras, Spain).
Structure length
1.360 kmLocation
Roskilde Fjord, Frederikssund, DenmarkSpan length
57.35 - 83.00 mStructure type
Viaduct over fjord.Width of the superstructure
19.70 mScope of work
Alternative design, detailed design.
MAP
GPS:
55.8127552N, 12.0591589E
zobrazit na mapy.cz