Completed in 2017
The bridge is formed by a continuous structure of nine spans of variable span length. The deck is formed by a box girder of a variable depth from 2.70 to 5.00 m that is segmentally cast in symmetrical cantilevers starting at piers. Only one half of the motorway has been constructed for now.
Structure length
593 mLocation
Motorway D3, section Svrcinovec - Skalite, SlovakiaSpan length
29.5 - 92.0 mStructure type
Motorway viaduct.Width of the superstructure
14.11 mScope of work
Alternative design, detailed design.
Completed in 2017
The bridge is formed by a continuous structure of nine spans of variable span length. The deck is formed by a box girder of a variable depth from 2.70 to 5.00 m that is segmentally cast in symmetrical cantilevers starting at piers. Only one half of the motorway has been constructed for now.
Structure length
593 mLocation
Motorway D3, section Svrcinovec - Skalite, SlovakiaSpan length
29.5 - 92.0 mStructure type
Motorway viaduct.Width of the superstructure
14.11 mScope of work
Alternative design, detailed design.
MAP
AWARDS
Award of the Slovak Chamber of Civil Engineers for the best project solution.
Award for ´Innovative approach to the bridge design and realization´. Slovak national fib committee.