D8 Motorway viaduct Kninice
D8 Motorway viaduct Kninice
Completed in 2006
Viaduct Knínice, which is situated near a small village Kninice, is formed by two parallel bridges of the length of 1,027 m and 1,077 m. Since the viaduct continues into the tunnel of Libouchec, the transverse gap between the bridges varies – from 0.90 to 9.00 m. The bridge decks are formed by spine girders with large overhangs. The girders, which have a variable depth from 1.40 m at midspan to 2.60 m at supports, were incrementally cast span-by-span in the formwork supported by an underslung movable scaffolding.
Structure length
1,027 m and 1,077 mLocation
Motorway D8, near a tunnel of LibouchecSpan length
31.50 – 42.00 mStructure type
Continuous spine girder structure.Width of the superstructure
14.80 + 14.80 mScope of work
Design for construction permission, Tender design, Detailed design.
MAP
GPS:
50.7381047N, 14.0085905E
zobrazit na mapy.cz
AWARDS
Award of the Czech Ministery of Transport, 2007.