Bridge Cadecka
Bridge Cadecka
Completed in 2017
The bridge is formed by a continuous structure of nine spans. The deck is formed by two plate girders of depth of 4.40 m that are composite with a cast-in-place concrete slab. The steel girders are incrementally launched; the deck slab is incrementally cast in a formwork suspended on movable scaffolding. Only one half of the motorway has been constructed for now.
Structure length
692 mLocation
Motorway D3, section Svrcinovec - Skalite, SlovakiaSpan length
52.5 - 87.0 mStructure type
Motorway viaduct.Width of the superstructure
14.11 mScope of work
Alternative design, detailed design.
MAP
GPS:
49.5142080N, 18.8713682E
zobrazit na mapy.cz