Bridge across the valley and dirt road
Bridge across the valley and dirt road
Completed in 2017
The bridge is formed by a continuous structure of seven spans. The deck is formed by precast girders of a constant depth of 2.10 m and a composite cast-in-place deck slab. Since the columns are connected with pier diaphragms by concrete hinges, the bridge forms semi-integral structural system. Only one half of the motorway has been constructed for now.
Structure length
271 mLocation
Motorway D3, section Svrcinovec - Skalite, SlovakiaSpan length
23.8 - 41.0 mStructure type
Motorway viaduct.Width of the superstructure
14.39 mScope of work
Alternative design, detailed design.