Bridge across the valley and dirt road

Completed in 2017

The bridge is formed by a continuous structure of seven spans. The deck is formed by precast girders of a constant depth of 2.10 m and a composite cast-in-place deck slab. Since the columns are connected with pier diaphragms by concrete hinges, the bridge forms semi-integral structural system. Only one half of the motorway has been constructed for now.

Structure length

271 m

Location

Motorway D3, section Svrcinovec - Skalite, Slovakia

Span length

23.8 - 41.0 m

Structure type

Motorway viaduct.

Width of the superstructure

14.39 m

Scope of work

Alternative design, detailed design.

MAP

GPS: 49.4998834N, 18.9197697E
zobrazit na mapy.cz