Bridge across the Ropicanka Creek
Bridge across the Ropicanka Creek
Completed in 2023
The viaduct, which consists of two parallel bridges, crosses the Ropičanka Creek, the railway and a local road. The nine‑span bridges are assembled of steel girders and a reinforced concrete slab. The girders were assembled on temporary towers, then the bridge slab was gradually concreted.
Structure length
381.50 mLocation
Highway I/68, Třanovice – NeborySpan length
28.00 – 45.00 mStructure type
Composite continues structure.Width of the superstructure
2 x 13.90 mScope of work
Detailed design.