Bridge across the railyard of the railway station in a city of Cheb
Bridge across the railyard of the railway station in a city of Cheb
Completed in 2023
The pedestrian bridge is formed by a continuous girder of 10 spans of span lengths from 17.5 to 87.0 m. The bridge deck is formed by a prestressed concrete girder of the channel cross section, which is suspended on two low pylons in the main span. The deck is being incrementally cast in the side span and consequently is being launched into the design position.
Structure length
398.0 mLocation
Railway station, Cheb, Czech RepublicSpan length
17.5 – 87.0 mStructure type
Cable-stayed bridge.Width of the superstructure
4.20 mScope of work
Design for construction permission, tender design, detailed design.