Bridge across the Ostravice River

Completed in 2022

The twin bridge is formed by a continuous girder of six spans. The deck of each bridge is assembled from four steel plate girders of depth of 1.90 m and a composite deck slab from reinforced concrete. The steel girders are via steel diaphragms indirectly supported by couples of slender concrete piers.

Structure length

264.0 m

Location

Motorway D48, Frydek-Mistek, bypass - 1st stage, Czech Republic

Span length

30.0 - 54.0 m

Structure type

Motorway viaduct.

Width of the superstructure

2 x 15.45 m

Scope of work

Tender design, detailed design.

MAP

GPS: 49.6580816N, 18.3640866E