Bridge across the Opava River and railway

Completed in 2007

The twin bridge has a deck assembled from steel plate girders and a composite deck slab. The steel deck structure was incrementally assembled beyond the abutment and subsequently launched into the design position. The deck is prestressed in transversal direction.

Structure length

732.0 + 738.8 m

Location

Ostrava, Motorway D1, section 4708.2 Ostrava, Rudna - Hrusov, Czech Republic

Span length

33.0 - 47.0 m

Structure type

Motorway viaduct.

Width of the superstructure

14.08 + 15.70 m

Scope of work

Design for construction permission, bid design, detailed design.

MAP

GPS: 18.21790997760499N, 49.829857943873094E
zobrazit na mapy.cz