Bridge across the Opava River and railway
Completed in 2007
The twin bridge has a deck assembled from steel plate girders and a composite deck slab. The steel deck structure was incrementally assembled beyond the abutment and subsequently launched into the design position. The deck is prestressed in transversal direction.
Structure length
732.0 + 738.8 mLocation
Ostrava, Motorway D1, section 4708.2 Ostrava, Rudna - Hrusov, Czech RepublicSpan length
33.0 - 47.0 mStructure type
Motorway viaduct.Width of the superstructure
14.08 + 15.70 mScope of work
Design for construction permission, bid design, detailed design.
Bridge across the Opava River and railway
Completed in 2007
The twin bridge has a deck assembled from steel plate girders and a composite deck slab. The steel deck structure was incrementally assembled beyond the abutment and subsequently launched into the design position. The deck is prestressed in transversal direction.
Structure length
732.0 + 738.8 mLocation
Ostrava, Motorway D1, section 4708.2 Ostrava, Rudna - Hrusov, Czech RepublicSpan length
33.0 - 47.0 mStructure type
Motorway viaduct.Width of the superstructure
14.08 + 15.70 mScope of work
Design for construction permission, bid design, detailed design.
MAP
GPS: 18.21790997760499N, 49.829857943873094E
zobrazit na mapy.cz