Bridge across the Olesna Creek and Pond Arnost
Completed in 2022
The twin bridge is formed by a continuous girder of five spans. The deck of each bridge is assembled from four steel plate girders of depth of 1.70 m and a composite slab from reinforced concrete. The steel girders are via steel diaphragms indirectly supported by couples of slender concrete piers.
Structure length
237.6 mLocation
Motorway D48, Frydek-Mistek, bypass - 1st stage, Czech RepublicSpan length
35.0 - 50.0 mStructure type
Motorway viaduct.Width of the superstructure
2 x 14.20 mScope of work
Tender design, detailed design.
Bridge across the Olesna Creek and Pond Arnost
Completed in 2022
The twin bridge is formed by a continuous girder of five spans. The deck of each bridge is assembled from four steel plate girders of depth of 1.70 m and a composite slab from reinforced concrete. The steel girders are via steel diaphragms indirectly supported by couples of slender concrete piers.
Structure length
237.6 mLocation
Motorway D48, Frydek-Mistek, bypass - 1st stage, Czech RepublicSpan length
35.0 - 50.0 mStructure type
Motorway viaduct.Width of the superstructure
2 x 14.20 mScope of work
Tender design, detailed design.
MAP
GPS: 18.320272693177344N, 49.66682582935675E
zobrazit na mapy.cz