Bridge across the Odra River and Antosovice Lake

Completed in 2007

The motorway bridge of the total length of 605 m is formed by a two-cell box girder for each direction of the motorway. In the main span of length of 105.0 m, and two adjacent spans, the girders are mutually connected by a top slab and by bottom transverse struts from high-strength concrete and they are suspended on a single-column steel-concrete composite pylon.

Structure length

605.0 m

Location

Bridge across the River Odra, Motorway D1

Span length

21.5 - 105.0 m

Structure type

Cable-stayed bridge.

Width of the superstructure

30.60 m

Scope of work

Design for construction permission, tender design, detailed design.

MAP

GPS: 49.8871570N, 18.3052585E
zobrazit na mapy.cz

AWARDS

Structure of the year 2008. ABF, magazines Economia a.s., and Stavitel, Ministry of Industry and Trade, Association of Building Entrepreneurs of the Czech Republic.

Award of the Czech Ministry of Transport, 2008.

Bridge of the year 2007. Ministry of Transport 2009.

The structure of the Moravian-Silesian Region 2007, 1st place.

The best investment of the year 2007. Ministry of Industry and Trade, Ministry for Regional Development, Association of Building Entrepreneurs of the Czech Republic.