D1 Motorway viaduct across the Lukovy Creek

Completed in 2003

The viaduct, which consists of two parallel bridges of four spans, bridges the Lukovy Creek and local roads. Both bridges form continuous beams of a double tee cross‑sections which were incrementally, span‑by‑span, cast on a stationary scaffolding. The decks´ diaphragms are only at the end abutments.

Structure length

134.40 m

Location

Motorway D1 near a city of Vyskov

Span length

25.00 – 35.00 m

Structure type

Continuous double tee structure.

Width of the superstructure

14.95 + 14.00 m

Scope of work

Detailed design.

MAP

GPS: 49.2734651N, 17.0433951E