Bridge across the existing Highway I/11
Bridge across the existing Highway I/11
Completed in 2015
The new highway I/11 under a very skew angle of 35° bridges the existing road by two parallel bridges formed by integral frame structures. The bridge deck of both bridges is made of steel girders and a composite concrete deck slab. The beams were erected with a concrete flange forming the formwork of the additionally cast slab.
Structure length
46.00 mLocation
Highway I/11, near a city of OpavaSpan length
43.35 mStructure type
Composite integral frame structure.Width of the superstructure
12.20 + 15.70 mScope of work
Alternative design, Detailed design.
MAP
GPS:
49.8941331N, 18.0377622E
zobrazit na mapy.cz