Bridge across the Ebro River

Completed in 2011

The self-anchored suspension bridge has composite deck formed by four-cell box girder. The deck is a frame connected both to piers and two short, low composite pylons.

The design was prepared with Tec 4, Barcelona, Spain.

In the structural & architectural competition, the design was awarded by the first prize and was selected for construction.

Structure length

254.1 m

Location

Deltebre – Sant Jaume D’Enveja, Spain

Span length

69 + 112 + 69 m

Structure type

Suspension bridge.

Width of the superstructure

19.3 m

Scope of work

Bid design, checking of final design.

MAP

GPS: 40.7128603N, 0.7173877E
zobrazit na mapy.cz