Bridge across the Doliansky Creek Valley

Completed in 2015

The bridge, which spans the Doliansky Creek Valley, is formed by a spine box girder with large overhangs supported by precast struts. Since the girder is frame‑connected with intermediate piers, the bridge forms a semi‑integral structural system. The superstructure was created gradually, first the spine box girder was cast, then the external struts were erected, and the overhangs were cast. The spine box girder was cast gradually, span by span in the formwork suspended on the overhead movable scaffolding.

Structure length

412.10 m

Location

Motorway D1, section Janovce – Jablonov, Slovakia

Span length

42.30 – 65.00 m

Structure type

Semi‑integrated continues structure.

Width of the superstructure

29.50 m

Scope of work

Alternative design, Detailed design.

MAP

GPS: 49.0088812N, 20.6603498E