Bridge across the dirt road and the stream
Bridge across the dirt road and the stream
Completed in 2021
The twin bridge is formed by a continuous girder of six spans. The deck of each bridge is formed by a double T girder that is assembled of two steel plate girders of depth of 2.80 m and a transversely prestressed composite concrete slab.
Structure length
273.5 mLocation
Motorway D48, section Rybi - MUK Rychaltice, Czech RepublicSpan length
35.3 - 47.0 mStructure type
Motorway viaduct.Width of the superstructure
2 x 14.30 mScope of work
Detailed design.
MAP
GPS:
49.6126818N, 18.0569457E
zobrazit na mapy.cz