Bridge across the Blue River

Completed in 2001

The bridge of one span is formed by a stress ribbon assembled from precast segments and a composite deck slab.

Design: Huitt-Zollars (GNA Inc), Denver, Colorado & Charles Redfield, Mill Valley, California

Structure length

76.8 m

Location

Blue Valley Ranch, Colorado, USA

Span length

76.8 m

Structure type

Stress ribbon.

Width of the superstructure

5.38 m

Scope of work

Jiri Strasky: Conceptual design, detailed static and dynamic analysis.

MAP

GPS: 40.0030071N, 106.3790893W
zobrazit na mapy.cz