Bridge across the Blue River
Bridge across the Blue River
Completed in 2001
The bridge of one span is formed by a stress ribbon assembled from precast segments and a composite deck slab.
Design: Huitt-Zollars (GNA Inc), Denver, Colorado & Charles Redfield, Mill Valley, California
Structure length
76.8 mLocation
Blue Valley Ranch, Colorado, USASpan length
76.8 mStructure type
Stress ribbon.Width of the superstructure
5.38 mScope of work
Jiri Strasky: Conceptual design, detailed static and dynamic analysis.
MAP
GPS:
40.0030071N, 106.3790893W
zobrazit na mapy.cz