Bridge across the Bilina River
Bridge across the Bilina River
Completed in 2018
The bridge is formed by two parts: main cable-stayed spans crossing the railway tracks and Bilina River, and by continuously linked approach spans from prestressed concrete. The deck of the suspended spans is formed by two steel edge plate girders, floor beams and a composite deck slab, the approaches are formed by concrete edge girders and a deck slab.
Structure length
183.7 mLocation
Road III/2565, Most, Czech RepublicSpan length
18.0 - 51.0 mStructure type
Cable-stayed bridge.Width of the superstructure
11.40 - 12.20 mScope of work
Alternative design, detailed design.
MAP
GPS:
50.5180412N, 13.6421307E
zobrazit na mapy.cz