Completed in 2018
The twin bridge is formed by a continuous girder of eight spans. The deck of each bridge is formed by a box girder that is assembled of a steel girder of the trough cross section and a composite cast-in-place concrete slab. The steel girders were incrementally launched; the deck slab was incrementally cast in a formwork suspended on movable scaffolding.
Structure length
478.6 mLocation
Freeway I/11, Ostrava, Czech RepublicSpan length
45.0 - 64.5 mStructure type
Freeway viaduct.Width of the superstructure
2 x 13.65 mScope of work
Alternative design, detailed design.
Completed in 2018
The twin bridge is formed by a continuous girder of eight spans. The deck of each bridge is formed by a box girder that is assembled of a steel girder of the trough cross section and a composite cast-in-place concrete slab. The steel girders were incrementally launched; the deck slab was incrementally cast in a formwork suspended on movable scaffolding.
Structure length
478.6 mLocation
Freeway I/11, Ostrava, Czech RepublicSpan length
45.0 - 64.5 mStructure type
Freeway viaduct.Width of the superstructure
2 x 13.65 mScope of work
Alternative design, detailed design.