Bridge across existing road I/11
Completed in 2015
The bridge structure is formed by a frame structure assembled of a composite deck and concrete abutments supported by drilled piles. The deck is assembled of plate girders and composite concrete slab. The girders were erected with concrete flanges used as forms of the cast-in-place deck slab.
Structure length
91.4 m (l. bridge), 79.3 km (r. bridge)Location
Freeway I/11, Ostrava, Czech RepublicSpan length
42.8 mStructure type
Integral frame structure.Width of the superstructure
29.00 mScope of work
Alternative design, detailed design.
Bridge across existing road I/11
Completed in 2015
The bridge structure is formed by a frame structure assembled of a composite deck and concrete abutments supported by drilled piles. The deck is assembled of plate girders and composite concrete slab. The girders were erected with concrete flanges used as forms of the cast-in-place deck slab.
Structure length
91.4 m (l. bridge), 79.3 km (r. bridge)Location
Freeway I/11, Ostrava, Czech RepublicSpan length
42.8 mStructure type
Integral frame structure.Width of the superstructure
29.00 mScope of work
Alternative design, detailed design.
MAP
GPS: 18.037762244298392N, 49.89413311833846E
zobrazit na mapy.cz