The buried bridge of one span is formed by precast girders and a composite deck slab - both from high strength concrete. The abutments are supported by reinforced earth; the fill above the deck is from polystyrene.
Structure length
36.6 mLocation
Motorway D1, section 0133 Vyskov - Morice, Czech RepublicSpan length
34.8 mStructure type
Motorway bridge.Width of the superstructure
48.0 mScope of work
Design for construction permission, detailed design.
Bridge across country road and Rumza creek
Completed in 2004
The buried bridge of one span is formed by precast girders and a composite deck slab - both from high strength concrete. The abutments are supported by reinforced earth; the fill above the deck is from polystyrene.
Structure length
36.6 mLocation
Motorway D1, section 0133 Vyskov - Morice, Czech RepublicSpan length
34.8 mStructure type
Motorway bridge.Width of the superstructure
48.0 mScope of work
Design for construction permission, detailed design.