Bridge across the Olesna Creek and Pond Arnost

Completed in 2022

The twin bridge is formed by a continuous girder of five spans. The deck of each bridge is assembled from four steel plate girders of depth of 1.70 m and a composite slab from reinforced concrete. The steel girders are via steel diaphragms indirectly supported by couples of slender concrete piers.

Structure length

237.6 m

Location

Motorway D48, Frydek-Mistek, bypass - 1st stage, Czech Republic

Span length

35.0 - 50.0 m

Structure type

Motorway viaduct.

Width of the superstructure

2 x 14.20 m

Scope of work

Tender design, detailed design.

MAP

GPS: 49.6668258N, 18.3202727E
zobrazit na mapy.cz