Bridge across the Malkovsky Creek Valley

Completed in 2021

The twin bridge is formed by a continuous girder of seven and eight spans. The deck of each bridge is formed by a single cell box girder of constant depth of 3.50 m which was progressively cast in symmetrical cantilevers starting at piers.

Structure length

431 m (l. bridge), 486 m (r. bridge)

Location

Motorway D1, Slovakia

Span length

42.0 - 70.0 m

Structure type

Motorway viaduct.

Width of the superstructure

14.15 + 14.55 m

Scope of work

Construction engineering.

MAP

GPS: 48.9862630N, 21.2107873E
zobrazit na mapy.cz