Ecoduct across the D1 Motorway near Hrabuvka

Completed in 2008

The tunnel bridge is formed by two flat arches. The horizontal force of the arches is resisted by prestressed ties (stress ribbons) situated above the arches.

Structure length

70.4 m

Location

Motorway D1, section 4704 Lipnik and Becvou - Belotin, Czech Republic

Span length

2 x 25.0 m

Structure type

Arch structure.

Width of the superstructure

79.7 m

Scope of work

Design for construction permission, bid design, detailed design.

MAP

GPS: 49.5737065N, 17.6996882E
zobrazit na mapy.cz