Bridge across the existing Highway I/11

Completed in 2015

The new highway I/11 under a very skew angle of 35° bridges the existing road by two parallel bridges formed by integral frame structures. The bridge deck of both bridges is made of steel girders and a composite concrete deck slab. The beams were erected with a concrete flange forming the formwork of the additionally cast slab.

Structure length

46.00 m

Location

Highway I/11, near a city of Opava

Span length

43.35 m

Structure type

Composite integral frame structure.

Width of the superstructure

12.20 + 15.70 m

Scope of work

Alternative design, Detailed design.