D35 Motorway viaduct across the Morava River

Completed in 2002

The D35 motorway bridges the Morava River via a 239 m long viaduct. The viaduct consists of two parallel six‑span bridges formed by continuous spine girders with large overhangs. The girders, which have a variable depth from 1.40 m at midspan to 2.60 m at supports, were incrementally cast span-by-span in the formwork supported by an underslung movable scaffolding.

Structure length

239.00 m

Location

Motorway D35 near a city of Olomouc

Span length

34.00 – 45.00 m

Structure type

Continuous spine girder structure.

Width of the superstructure

15.42 + 15.42 m

Scope of work

Design for construction permission, Tender design, Detailed design.