Bridge across the Ropicanka Creek

Completed in 2023

The viaduct, which consists of two parallel bridges, crosses the Ropičanka Creek, the railway and a local road. The nine‑span bridges are assembled of steel girders and a reinforced concrete slab. The girders were assembled on temporary towers, then the bridge slab was gradually concreted.

Structure length

381,50 m

Location

Highway I/68, Třanovice – Nebory

Span length

28.00 – 45.00 m

Structure type

Composite continues structure.

Width of the superstructure

2 x 13.90 m

Scope of work

Detailed design.